Ga Chassis I

hace 2 semanas


Saltillo, México Stellantis A tiempo completo

**Job ID**: 2001897

**Career Area**: Manufacturing

**Job Category**:
**Location**: Saltillo Assembly
25300, MX

**Date Posted**: June 16, 2023

**Brand**: FCA Group

Job Overview

**Qualifications**:
Manufacturing Engineering Project Manager Engineer Specialist for STAP & SVAP

New Project Lead Manufacturing Engineering

Lead with SPW under progress implementation, Capex implementation on automotive industry with excellent saving cost over 1 Million, with experince to upgrade Gas facilities and communization tools, facilities ( ergo arms, torque tubes and sub-assy systems ) for new products models.

Lead to develop all investment projects for automotive plants (VF) for all areas trim, chassis and Final.

Leader for the new project type A implementation (New Models) on chassis/Trim/Final for the electrical vehicles in automotive Plants. (considering ,new volumes, new process, investment, feasibility product analysis, tool, fixtures, facilities, check fixtures for the process definition using the Engineering Standards, AGV selection, AGC selection, production simulation definition, ergonomics, cost investment reduction with product & process improvement and innovation, lesson learns implementation, installation timing definition by priorities, WCM ,WCT ,workbook deliverables, major kaizen develop, audit advances process, lean manufacturing, safety procedures, process simulation ,Critical feasibility Studies solution for Engineering and Manufacturing ,

Risk Assessment development with the financial cost deployment data to eliminate loose (Delivery impact, Lack of Material, Quality Impact, Labor Impact Maintenance) to increase the plants efficiency on the Engine Dress and Chassis Line.

Health Assessment support for the Maintenance Team to identify the process and Machinery high risk to stop, micro stops, breakdowns on the engine dress and chassis main line facilities (automotive Plants) and equipment’s and help to reduce the critical loses by these concepts.

Process simulation and tool process digital analysis by NX evaluation and critical design issues identify with Engineering before approvals and release designs.

Training VPE personnel and solver quality and process critical issues (GD&T, NAAMS, PC -DMIS, NX, Advanced Kaizen, One Page Report, Ecmm, AMPS Do’s & Don’ts, ODIMS ,PFMEAS, Error & Mistake Proofing, ODCICS2,Tool specification develop, Design Tools/Fixture/Machines review Process etc.)
Coordination of implementation the all-new Process, Fixtures, Equipment’s and Training for new models at Automotive Assembly Plants to cover the Quality and Engineering Requirements for the models changes for vertical launching.
Develop new products Investment project for Saltillo Truck and Van Assembly Plants
Implement the WCM & WCT tools to solve problems. (Advanced Kaizen, Major Kaizen, 5G, 5w, 5w1h, 4M, 4M1D, etc.) at STAP & SVAP.
Develop the Glide path for CP & CPK, Kaizen Control.

DMA (DIGITAL MOCKUP & ASSEMBLY) process Validation before Engineering Changes Notice.

Coordination for the tool/fixtures and equipment’s installation to process lines for vertical a vertical launching.

EEM tool implementation for new projects at STAP & SVAP.

Excellent KNOWLAGE of (GD&T,PC -DMIS, NX, Kaizen, One Page Report, Ecmm, AMPS Do’s & Don’ts, ODIMS, ODCICS2, etc.), NAAMS.
Implemented the CMM (Zeiss), LEICA and Atos measurement programs for the new Van’s Models.

QAF and Master bock to validation assembly process and supplier components and identify the solver issues.

Develop the measuruent chart standard time by sub assy. (Engine Box, Underbody, Cab Complete)
Implement the WCM Basic tools to solve problems. (5w, 5w1h, 4M, 4M1D, etc.)
Training to use the MBK and QAF equipment is and identify assembly issues.
Start to work with Black Book
Develop the Glide path for CP & CPK, Kaizen Control by Area.PQP.
Implement the PQP for BIW and TCF Loops validation by pilot phase.
CPA control and Quality controls with production and suppliers.
Dimensional measurement daily report.
Develop the master critical parts.
Budget develops for calendar year.
Activities Schedule by day, week and month.
Develop responsibilities Matrix
Dimensional Matrix
Inspection parts (Measurement before use online)

WCM & WCT Implementation and follow the Work Book control for Implementation projects for tools, Facilities and equipment’s at STAP & SVAP.

Chassis Geometric & Dimensional Control Sr. Engineer SVAP Plant

2008- 2011 Santa Fe Mexico, Head Quarter Office at Mexico City.

F500 Checking Fixtures and holding fixtures validation support for the Front End, front and rear fascia’s, cabrio folding top etc.
F500 Supplier process review with SQE team to verify the repeatability process.

Coordination of implementation the all Engineering Changes and GD&T Models, NAAMS on the METALSA Frame Fixtures and Checking Fixtures, holding Fixtures for the Automotive Models for Saltillo Assembly Plants.
Support the SQE Team to validate geometry cha