Seats Subassembly Process
hace 7 meses
ENGINEERING GRADUATE
FUNCTIONS
STRATEGIC: 55 %.
- **Develop strategic investment studies based on GVD program timings for code 1 and others assigned projects focused on reducing** waste and losses based on Plant CD and business case analysis.
- Create Critical Route Timings with attainment to the GVD for code 1 and others assigned projects in detailed for all GA Line.
- Create Specification Package considering Process and Product Standards, GD&T, government regulations, cycle time of the process, establishing all the KPI´s and deliverables based on Stellantis standards.
- Plan and coordinate interaction with the productive area for the introduction of new machinery and equipment in new or existing facilities for the manufacture of vehicles designated to Mexico Plants.
- Development and approval of layouts, program issuance and control plans.
- Supplier technical evaluation for purchase sourcing procedure to select the supplier desire based on the technical proposals for Tooling and Machinery Manufacturing.
- Creation, issuance and follow-up of Indirect Source Package and Purchase Requisitions to procure new machinery, tooling or facilities as product and process requires.
- Consider and assure the compliance of the Government Policies and regulations as part of the tooling/Facilities.
- Project management since the program approval phase until successful launch identifying the resources needed in each step for success vehicle vertical Launch.
- Feasibility studies Development to identify and fix the issue since the product design phase avoiding impact to the production line based on DFA, Value Engineering, PFMEA´s and Digital Scroll Review.
- Maintain actual ISO certifications. Contributing and managing projects based on Quality and environmental policies.
- EPM Early product management - design for assembly / make match with process design (tooling & machinery concept design )
- Tooling design engineering, revision and approval in agreement with the plant team, CoC, product engineering and suppliers.
- Implement Kaizen methodology from a proactive approach on early project phases.
OPERATIONAL: 30%
- Tooling buy off, installation, validation and start up on site floor on production plants. Coordinate the tooling/equipment installation tryouts, certification tests and assurance of the right operation of the equipment.
- Support plant team in the analysis and solution for quality, feasibility ergonomics and safety issues
- Train plant staff in the use of new technologies at Supplier of Plant facilities.
- Supply the appropriate tooling, devices and equipment to perform the assembly or test of all the components for the new models or versions at General assembly.
- Load and upload tool/machinery/facility 3D models and graphics from/into Team Center database.
- Get knowledge of TCF areas for succession plans: Seats subassembly make process, oven & iron processes to handle leather wrinkles, sequinece of seats subassembly process, H point measurement, scroll for subassembly seats, trim dressing line, Final Line and EOL processes. Like : Glass Cell, Badges installation, IP Setting, transmission flashing, pull out test, End Off Lines test, torque tools, Multi spindle torque tools, torque reaction arms, powertrain indexing process,
- Coordination of receive shipping tool/machinery from cross board countries supplier until plant arrival.
RESOURCE MANAGEMENT: 15%
- Assign proper people to perform buy off, validation and process verification of tooling, equipment and process.
- Control, spend and tracking Funds assignment for code1 and others assigned new projects at ME MP Portal.
- Create and lead a cross functional team for tooling development and validation at suppliers and plant sites.
- Track and spend the funds assignment from kaizen´s based on the Plant Cost Deployment with B/C approved by Controller.
- Schedule supplier support for training and pilot phases at plant, based on plant training requirements
- Lead and Tracking Suppliers activities during project phases (Estimation, Design, Tryouts, Installation, Pilots and Launch).
POSITION REQUIREMENTS
Experience for all GA Seats Sub assembly position:
- 5 Years of experience as manufacturing engineer in the automotive industry handling all projects phases for Machinery & Equipment: Design concept, Design reviews, Manufacturing Phase, Buy Off, Dimensional certification, Shipping, Installation and Validation and run Pilots and get Launching Phase Supervision.
- 5 Years of mínimal experience on 3D/2D CAD management.
- 5 Years of mínimal experience on Investment studies related to long and medium projects.
- 5 years of minimum experience in Trim assembly process as : seats subassembly process, EOL and iron -oven seats processes, Urethane Glass cell, IP Setting Install, Badges Install, Door Off / Door On, and Sun Roof Install or similar preferably in the automotive industry.
- 5 Years of demonstrable experience in Subassembly seat processes, Assist arms, S
-
Seats Subassembly Process
hace 7 meses
Saltillo, México FCA A tiempo completoENGINEERING GRADUATE FUNCTIONS **STRATEGIC**: 55 %. Develop strategic investment studies based on GVD program timings for code 1 and others assigned projects focused on reducing waste and losses based on Plant CD and business case analysis. Create Critical Route Timings with attainment to the GVD for code 1 and others assigned projects in detailed for...
-
Lead Product Engineer
hace 7 meses
Saltillo, México Lear Corporation A tiempo completo**Job Listing Detail** **Lead Product Engineer **for operations in Central Offices Structures (Saltillo, Coahuila) Lear Corporation is number 70 on the list of 500 Most Important Companies in Mexico 2020 according to Expansion Magazine Components that are manufactured in our country include: structures and mechanisms for seats, trim, foam, leather,...
-
Sr Product Engineer
hace 6 meses
Saltillo, México Lear Corporation A tiempo completo**NEW CAREER OPPORTUNITY|** **Sr Product Engineer **for operations in Central Offices Structures (Saltillo, Coahuila) Lear Corporation is number 70 on the list of 500 Most Important Companies in Mexico 2020 according to Expansion Magazine Components that are manufactured in our country include: structures and mechanisms for seats, trim, foam, leather,...
-
Jr Product Engineer
hace 7 meses
Saltillo, México Lear Corporation A tiempo completo**NEW CAREER OPPORTUNITY|** **Jr Product Engineer **for operations in Central Offices Structures (Saltillo, Coahuila) Lear Corporation is number 70 on the list of 500 Most Important Companies in Mexico 2020 according to Expansion Magazine Components that are manufactured in our country include: structures and mechanisms for seats, trim, foam, leather,...
-
Manufacturing Engineer
hace 4 meses
Saltillo, México Android Industries A tiempo completoDo you want to work at an organization that is people focused, service minded and results oriented, that offers their customers creative problem solving, progressive solutions, and improved outcome? Then Android Industries may be the place for you. We are committed to a culture of excellence, with a focus on best practices and continuous improvement. We...
-
Chief Product Innovation Manager
hace 4 días
Saltillo, Coahuila de Zaragoza, México Lear Corporation A tiempo completoJob Title: Chief Product Innovation ManagerWe are seeking a highly skilled and innovative Chief Product Innovation Manager to lead product development at Lear Corporation's Central Offices Structures in Saltillo, Coahuila.Lear Corporation is a leading manufacturer of automotive components, ranking 70th on the list of 500 Most Important Companies in Mexico...