Steam Turbine Technical Field Advisor
Hace 3 días
mexicali, baja california, México
On Grid Infrastructure Services, Llc
Jornada completa
Gratis con email o Google
Guarda esta oferta y sigue tu búsqueda
Crea una cuenta gratis para guardar empleos, crear alertas y volver a esta oferta desde tu panel.
Gratis con email o Google
Al continuar, aceptas nuestros Términos & Política de Privacidad.
Technical Field Advisor to provide owner representation for the outage as described below.
- - Work in parallel with the contractor lead to maintain clear communication with HPU.
- - Provide technical review/witness of critical data points and inspections.
- - Provide daily reports of outage progress/issues.
- - Provide a final report at outage completion.
- Plant Information:
- Saavi, La Rosita 1 Steam Turbine
- Baja California/Mexicali, Mexico
- Unit Information:
- Alstom 292 MW ZZ3 o SNGM01171
- GEN Alstom 60 WT21 H-102 hydrogen cooled. Proposed Schedule:
08 JAN 27 – 19 FEB 27
Work Scope: 1. Turbine- Disassembly of lagging, casings, shells, blades, vanes, etc.
- Inspection and NDT of turbine casing, rotor, blades, diaphragms, guide vanes, bearings,
- coupling and sealing on turbine. Ensure all opening and closing measurements are taken and
- recorded properly.
- Blast clean turbine rotors, visually inspect, record conditions, mag particle NDE, low speed rotor
- balance, reinstall rotors, perform rotor alignment checks and record rotor clearances
- Inspection and NDT of inlet steam valves, extraction valves, Non-Return Valves
- Disassemble steam side for inspection
- Visually inspect disc, seat and strainer (NDE seal weld)
- Perform contact check on seats and discs
- Record clearance and run out of stem
- Clean stems and bushings and record clearances; reassemble
- Visually inspect disc, seat and strainer (NDE seal weld)
- Inspection of valves, actuators, strainers for gland- and leak-off system
- inspection of valves, pumps, motors, filters, coolers, servomotors, for lube and hydraulic oil
- system.
- Inspection of heat exchangers and condensers in turbine auxiliary system
- Reassembly
- Supply and install all STG Soft-parts
- Steam Valves Hydraulic Actuators
- External, visual inspection of operating actuators
- Replace rod seals and wipers if necessary
- Inspect and change servo strainers
- Hydraulic Pumping System
- (Owner will drain and refill tank.)
- Inspect and charge accumulators.
- Check pump operations and motor alignment.
- Clean compensators.
- Check and adjust relief valves as required.
- Change filters, clean screens, reset indicators.
- Clean and leak check EHC coolers
- Inspect air dryer, recharge if necessary.
- Turbine Control Components
i. Visually inspect linkage and adjust.
- Check and adjust oil trip nozzle.
- Clean and set gap on speed pickups.
- Clean and inspect thrust bearing wear detector.
- Stroke and check calibration of turbine stop and control valves. (In conjunction with customer I & C)
- Inspect and clean low bearing pressure trip relay.
d. Supply and install all STG Soft-parts
- Lube Oil System
- Owner will drain and refill oil tank
- Clean and inspect oil tank
- Main oil pump: Disassemble, clean, inspect, record clearances and conditions and reassemble
- Remove cooler heads, clean tube sheets and tubes with brushes, inspect and reassemble
- Auxiliary oil pumps: Disassemble pumps, clean, visually inspect, record clearance and conditions
- and reassemble (motor inspection not included)
- Supply and install all STG Soft-parts
- Turning Gear
- Examine gears for wear and condition, clean and check operation (motor inspection not included)
- Supply and install all STG Soft-parts
- Steam Seal System (Responsibility of owner)
a. TFA will provide technical support for the following:
- Steam Seal Regulator Valves
- Disassemble and visually inspect pilot steam side of valve, piston and cylinder
- Disassemble bellows and pivot rod and inspect
- Disassemble feed and dump valves and inspect
- Reassemble and check adjust as required
- Spray Chamber (Hood spray)
- Disassemble, clean and inspect inlet water nozzle and strainer
- Adjust butterfly valves (customer scope)
- Gland Exhauster
- Disassemble blower, clean, inspect, record clearances and conditions and reassemble (motor inspection not included)
- Remove gland condenser head
- Clean tubes by wire brush
- Supply and install of all steam seal system parts
- Turbine Supervisory Instrumentation
a. Visually inspect and chec