Industrial Engineer
hace 3 semanas
**Material Flow Program Manager**- **Timeline definition of new programs**- **Monitoring of the general status of the project**- **Review and approve quotes****The Deliverables**:1. Station Readiness/Installa. 100% of stations fully operational and bought off according to the production intent plan (see General Section)b. Work to identify, design, and implement Minimal Material Handling (MMH) and Low Cost Automation (LCA)c. Ensure that CAD drawings are up to date and representative of floor walks and POR2. Dataa. Maintain and ensure all relevant Station Readiness Data in PFEP is up to date.b. Daily maintenance of all Open issue lists, WPI/ELM Checklists, PFEP data, Kaizen Journal, Timeline, Checklist, Issue Lists, Lessons Learned, Best Practices, etc.**The KPIs**:1. 100% of the stations bought off by all Plant, WPI, Production teams two (2) weeks prior to VPA, PS and VPa. Station to be bought off from a IE/WO and Safety/Ergo standpointb. Equipment is to be correct from a Packaging and Material Flow (proper lineside quantity to support delivery and WCM) standpoint2. Dataa. Zero Open Issues on the WPI open issue listb. Zero Pending issues over 30 days old without a realistic planned closed date**The KAIs**:1. Station Readiness/Installa. 100% of stations fully operational and bought offi. Working with IE to make sure the correct parts are in the station in the correct order and that the arrangement of the parts in the station satisfies both IE and WO.ii. Working with WPI Teams on maintaining rapid issue resolution:1. The Zone Lead is the first and last point of contact for the station2. The Lead will make sure the plan for the station is accurate and can be executed in a timing manor to meet the overall launch strategy3. The Lead will be the champion of all issues within the zone(s) assigned4. Working with any ME, WPI, PC, etc. Checklists, Kaizen Journals, open issue lists to make sure all issues are closed or have an action plan to closureiii. Working with the Safety/Ergo Team to ensure compliance with the Latest Safety/Ergo Documents:0. General Safety Standard "R"1. NAFTA_EHS_STD_OViv. Working with Material Flow Lead to:0. Understand the routes that deliver the parts, making sure that the routes can support station readiness and that the equipment can support the routes (i.e. Tip Tables, GFR Sizing, etc)1. Make sure that the parts on line follow WCM Lineside stock levels and Flow Types.2. Make sure all equipment is physically and ergonomically deliverablev. Working with Packaging Teams to buy off designs and make sure F&E can support packaging plan0. Be the main interface between the Packaging team and the WPI/Plant teamsa. All requests should flow through the appropriate station readiness lead to make sure the effects on F&E and Manpower are taken into accountb. The Packaging team should not be working with the plant directlyvi. Getting parts into the Golden and Strike Zones1. The Strike zone is between 36" and 48" from the operator feet position2. Golden Zone - See Section on Golden and Strike Zonesvii. Working with the F&E lead to:2. Make sure GFRs are sized:- To extend to the aisle at the F&E leads appropriate increments (usually 6")a. Support at least 3 pick cycles worth of material (usually 3 hours)b. Support Ergonomic requirements for load and unload3. Tracking Timing on all Equipment to make sure it can be installed on time4. Installation of equipment in it's proper place and on time5. Buy-off on stations by WPI/IE/Safety/Ergo/WO/ICT/etcviii. Dunnage Stands0. Design Dunnage Stands to store returnable or expendable dunnage from the container, must be sized appropriately from the dunnageix. Tip Tables0. Design tip tables to support Quality and material flow quantity needed (based on route data)b. MMH & LCAi. Identify opportunities for Minimal Material Handling (Drive Buy/Bump Systems, AGC deliveries, hands free, etc.)ii. Present to Material Flow Specialist, Program Manager, F&E Lead, and Production Control by the end of ELM Step 3iii. Work to design and implement concepts agreed uponc. Up to Date CADi. Ensure that the physical station matches the CAD layout and deviations are trackedii. Cannot overly rely on other team's layout accuracy assume that WPI/ME drawings and installations will be inaccurateiii. Open issues against inaccuracies.2. Dataa. Working with the PFEP Lead in maintaining the transparent status of each station within the Lead's assigned zone(s)i. Working to make sure that the that the following are up to date, accurate and realistic of the state of the floor and the plan:1. PFEP needs to be the POR for station readinessi. Equipment Assignmentsii. Install Statusiii. Parts per vehicle per stationiv. Verify Scroll data2. ELM 7 Step Checklist3. Kaizen Journals, internal and external4. Timeline Updates5. Work Place Integration (WPI)6. Production Controlb.
-
Me - Industrial Engineer
hace 2 semanas
Saltillo, México Aptiv A tiempo completo**INDUSTRIAL ENGINEER****Position Summary**Connection Systems team is seeking an Industrial Engineer for VES portfolio. This position is responsible for new projects development for North American operations within the Manufacturing Engineering Team.**Your Role**- Coordinate and launch new projects.- Develop Manufacturing System Design.- Estimate new...
-
Me - Industrial Engineer
hace 6 días
Saltillo, México Aptiv plc A tiempo completoConnection Systems team is seeking an Industrial Engineer for VES portfolio. This position is responsible for new projects development for North American operations within the Manufacturing Engineering Team. **Your Role** - Coordinate and launch new projects. - Develop Manufacturing System Design. - Estimate new processes according Takt Time requirements. -...
-
Quality Engineer
hace 1 semana
Saltillo, México Stellantis A tiempo completoAnalysis, follow-up and closure of problems reported by internal and external customer, complying with the required standards.- Development, modification and implementation of process standards to achieve improvement in product quality.- I work with the areas of production, maintenance to improve the indicators of the department and the...
-
Quality Engineer
hace 6 días
Saltillo, México Stellantis A tiempo completoAnalysis, follow-up and closure of problems reported by internal and external customer, complying with the required standards. - Development, modification and implementation of process standards to achieve improvement in product quality. - I work with the areas of production, maintenance to improve the indicators of the department and the...
-
Industrial Engineer
hace 6 días
Saltillo, México Joyson Safety Systems A tiempo completo**Together we save lives!** The keys to success are yours at Joyson Safety Systems! We are a global leader in design, development and manufacturing of safety-critical systems and components for automotive and non-automotive markets. We are committed to bringing life-saving technology to customers worldwide. Our company is headquartered in Auburn Hills,...
-
Quality Engineer
hace 1 semana
Saltillo, México FCA A tiempo completoAnalysis, follow-up and closure of problems reported by internal and external customer, complying with the required standards.- Development, modification and implementation of process standards to achieve improvement in product quality.- I work with the areas of production, maintenance to improve the indicators of the department and the company.- Industrial...
-
Industrial Engineer
hace 3 semanas
Saltillo, México Quanta Computer A tiempo completoEducación profesional : IMA, IME, Ing industrial y de sistemas.Experiência : Ingeniería Industrial 3 años (Ingeneria Industrial y Manufactura)Conocimientos técnicos:- Elaboración de diagramas de proceso y gráficas de carga.- Generación y administración de trabajo estándar para lineas de producción.- Ing. de métodos, balanceos de líneas vs Takt...
-
Quality Engineer
hace 6 días
Saltillo, México FCA A tiempo completoAnalysis, follow-up and closure of problems reported by internal and external customer, complying with the required standards. - Development, modification and implementation of process standards to achieve improvement in product quality. - I work with the areas of production, maintenance to improve the indicators of the department and the company. -...
-
Industrial Engineer Iii
hace 3 semanas
Saltillo, México Lennox International A tiempo completoCompany Profile:**Lennox (NYSE: LII)** Driven by 130 years of legacy, HVAC and refrigeration success, Lennox provides our residential and commercial customers with industry-leading climate-control solutions. At Lennox, we win as a team, aiming for excellence and delivering innovative, sustainable products and services. Our culture guides us and creates a...
-
Product Engineer
hace 2 semanas
Saltillo, México Yanfeng Automotive A tiempo completo**Job Summary**:The Product Engineer drives product design, development and plant support to effectively and efficiently launch products, as well as grow technical capabilities.**Responsibilities/Essential Functions**:- Understand internal and external customer design requirements- Create Design- Communicate Design- Validate Design- Launch Product- Utilize...