Site Purchasing Supplier Quality Professional

hace 1 semana


Monterrey, México OPmobility A tiempo completo

SITE PURCHASING SUPPLIER QUALITY PROFESSIONAL**Fecha**:17 oct. 2025**Ubicación**: Monterrey, MX**Empresa**:OP MobilityMissionManage the APQP process with suppliers to achieve non-event launches in alignment to OEM and IES specific requirements. Coordinate and manage supplier PPAP’s to closure utilizing supplier portal. Engage with the POAE Plant SQE on risks and containment during launch. Manage program changes with suppliers 6 months after SOP. On time PPAP, on-time APQP, Supplier ppm, Green (non-event) launches1.0 Contributes to the selection of new suppliers, and to commodity strategy definition.- Conducts feasibility assessments with potential suppliers prior to nomination (collect technical dataand drawings with Engineering Program Manager (EPM); communicate with suppliers to ensure thefeasibility commitment is achieved properly by suppliers).- Supports the nomination process prior to the sourcing committee.2.0 Manage the APQP / PPAP process with the suppliers- Manages supplier to reach PPAP on-time together with the program buyers and the Supplier ProgramManager (SPM). Develop a supplier risk mitigation plan.- Monitors APQP deliverables: Feasibility commitment, APQP planning, Measurement plans, Controlplans, product & process FMEA, validation plans, run at rates, acceptance reports, appearanceapproval reports, checking fixtures concepts, checking fixtures R&R studies.- Analyses first off-tool parts and start of Part history tracking at the supplier.- Enforces a CONVERGENCE process on critical (safety) or significant characteristics (fit and function).Ensures the cascading to suppliers of OEM and Project SC and CCs. Make sure these SC and CCs aretaken into account into supplier FMEAs and control plans.- Monitors mountability and packaging validation (build trials), with support of Plant Supplier QualityEngineer.and conducts a process audit if needed as part of risk mitigation plan. Applies OEM specific Process(SDL). E.g. VDA 6.3.the ISAR (Initial Samples Acceptance Report) with the supplier. Report progress for each program andeach supplier.3.0 Supplier Launch to SOP- Together with the Plant SQE prepares incoming inspection (boundary samples; limit samples, andinstructions).- Supervises Supplier Ramp-up (Quality Firewall with inspection evidence). - Ensures Supplier NCN’s are generated (in SAP-QM) and issues are resolved quickly and effectively. - Conducts lessons learned session with supplier and register lessons learned to POAE lessons learned database. 4.0 Change management - Ensures a transparent process of change management from the program team through to the supplier. - During Launch ensures the part status (configuration, revision levels) are maintained at plant and PPAP on-line system in agreement with the engineering BOM. 5.0 Supplier Development after SOP - Supports the Supplier Development leader with program performance analysis and program lessons learnedLI-GS1



  • Monterrey, México OPmobility A tiempo completo

    BU Purchasing Supplier Quality Professional Mission: Manage the APQP process with suppliers to achieve non‑event launches in alignment with OEM and IES specific requirements. Coordinate and manage supplier PPAPs to closure utilizing the supplier portal, engage with the POAE Plant SQE on risks and containment during launch, and manage program changes with...


  • Monterrey, México OPmobility A tiempo completo

    BU Purchasing Supplier Quality Professional Mission: Manage the APQP process with suppliers to achieve non‑event launches in alignment with OEM and IES specific requirements. Coordinate and manage supplier PPAPs to closure utilizing the supplier portal, engage with the POAE Plant SQE on risks and containment during launch, and manage program changes with...


  • Monterrey, México OP Mobility A tiempo completo

    BU PURCHASING SUPPLIER QUALITY PROFESSIONAL - Manage the APQP process with suppliers to achieve non-event launches in alignment to OEM and IES specific requirements. Coordinate and manage supplier PPAP’s to closure utilizing supplier portal. Engage with the POAE Plant SQE on risks and containment during launch. Manage program changes with suppliers 6...


  • Monterrey, México OPmobility A tiempo completo

    BU PURCHASING SUPPLIER QUALITY PROFESSIONAL **Fecha**:25 jul. 2025 **Ubicación**: Monterrey, MX **Empresa**:OP Mobility Mission Manage the APQP process with suppliers to achieve non-event launches in alignment to OEM and IES specific requirements. Coordinate and manage supplier PPAP’s to closure utilizing supplier portal. Engage with the POAE Plant...


  • Monterrey, México OPmobility A tiempo completo

    BU PURCHASING SUPPLIER QUALITY PROFESSIONAL**Fecha**:18 sep. 2025**Ubicación**: Monterrey, MX**Empresa**:OP MobilityMissionManage the APQP process with suppliers to achieve non-event launches in alignment to OEM and IES specific requirements. Coordinate and manage supplier PPAP’s to closure utilizing supplier portal. Engage with the POAE Plant SQE on...


  • Monterrey, México OPmobility A tiempo completo

    BU PURCHASING SUPPLIER QUALITY PROFESSIONAL**Fecha**:25 jul. 2025**Ubicación**: Monterrey, MX**Empresa**:OP MobilityMissionManage the APQP process with suppliers to achieve non-event launches in alignment to OEM and IES specific requirements. Coordinate and manage supplier PPAP’s to closure utilizing supplier portal. Engage with the POAE Plant SQE on...


  • Monterrey, México OPmobility A tiempo completo

    A leading automotive company located in Monterrey, Nuevo León is seeking a Purchasing Supplier Quality Professional. This role involves managing the APQP process with suppliers to achieve successful launches and ensuring compliance with OEM and IES requirements. The ideal candidate will contribute to supplier selection, oversee the PPAP process, and lead...


  • Monterrey, México Plastic Omnium A tiempo completo

    Mission Manage the APQP process with suppliers to achieve non-event launches in alignment to OEM and IES specific requirements. Coordinate and manage supplier PPAP’s to closure utilizing supplier portal. Engage with the POAE Plant SQE on risks and containment during launch. Manage program changes with suppliers 6 months after SOP. On time PPAP, on‑time...


  • Monterrey, México Plastic Omnium A tiempo completo

    Mission Manage the APQP process with suppliers to achieve non-event launches in alignment to OEM and IES specific requirements. Coordinate and manage supplier PPAP’s to closure utilizing supplier portal. Engage with the POAE Plant SQE on risks and containment during launch. Manage program changes with suppliers 6 months after SOP. On time PPAP, on‑time...


  • Monterrey, Nuevo León, México OP Mobility A tiempo completo

    MissionManage the APQP process with suppliers to achieve non-event launches in alignment to OEM and IES specific requirements. Coordinate and manage supplier PPAP's to closure utilizing supplier portal. Engage with the POAE Plant SQE on risks and containment during launch. Manage program changes with suppliers 6 months after SOP. On time PPAP, on-time APQP,...